Field problem
Coordinate
Tell someone or document it before you close it up.
Follow the equipment/submittal/manufacturer connection requirement: wrong diffuser/boot connection at terminal unit.
Verify the terminal unit, branch, and device before connecting. A boot can be connected neatly and still feed the wrong diffuser or wrong zone.
In Equipment Connections: RTU, AHU, VAV, Fans & Louvers, I'm looking at: Wrong diffuser/boot connection at terminal unit. What should I verify before I cut, drill, seal, cover, move, or install?
More in Equipment Connections: RTU, AHU, VAV, Fans & Louvers