Apprentice question
Stop and ask
Stop. Get direction before you touch it.
Stop before the grease duct gets welded, wrapped, or closed in as a flat run. Verify the approved grease duct detail, slope direction, cleanout/drain requirements, and support elevation before continuing.
['Grease duct is not normal comfort-air duct. If a horizontal grease run is hung flat when the approved design requires slope or drainage, grease can pool in low spots and turn the install into a fire/inspection problem.', 'Do not guess the slope number from memory. Check the mechanical drawings, grease duct detail, hood/exhaust submittals, code/AHJ requirement, and foreman direction. Then adjust supports/elevations before the run is welded, wrapped, or made hard to access.']
why can't commercial kitchen grease duct just be hung level?