Foreman script
Stop and ask
Stop. Get direction before you touch it.
Who needs to approve this field change before we install it?
The route/detail needs to change from the drawing. Do you want foreman direction only, or does this need PM/GC/engineer coordination?
9060 who needs to approve this field change fourth-year field change approval red 4 who needs to approve this field change before we install it? the route/detail needs to change from the drawing. do you want foreman direction only, or does this need pm/gc/engineer coordination? fourth-year field change approval: who needs to approve this field change?. i have the location and what i checked. who should verify before i keep going?