Apprentice question

Stop and ask

Stop. Get direction before you touch it.

What should I do if a hammer drill hits steel while drilling anchors in a concrete slab?

Stop drilling immediately. Do not force the bit through steel in a post-tension or structural slab. Mark the location, protect the hole, and get direction before relocating anchors or scanning the slab.

['Hitting steel while drilling anchors is not a normal “push harder” moment. In commercial slabs, especially post-tensioned decks, that obstruction could be rebar, a tendon, embed, sleeve, conduit, or other structural component.', 'The field move is to stop the bit, mark the location, tell the foreman, and verify the slab condition before changing the hanger layout. The likely recovery is an approved shifted hanger location, a different anchor detail, or a GPR/scan layout. Final anchor placement belongs to the approved support detail, foreman, and structural/project direction.']

Hangers, Supports, Rods & Trapeze 3rd Year RED

Stop if

Check

Steps

More in Hangers, Supports, Rods & Trapeze