What should I be staging for the journeyman while they are measuring the next piece?
Have the next sequential duct pieces un-crated, gaskets applied, hardware buckets open, correct size impact sockets ready, drift pins at hand, and any necessary slips/drives cut to length nearby.
['Have the next sequential duct pieces un-crated, gaskets applied, hardware buckets open, correct size impact sockets ready, drift pins at hand, and any necessary slips/drives cut to length nearby.']
Use this as training guidance. The foreman, approved drawings, project specs, manufacturer installation instructions, employer safety policy, and AHJ/code requirements always control the final answer.
Steps
Stop and verify the approved detail, manufacturer instructions, foreman direction, and project specs before touching it.
Have the next sequential duct pieces un-crated, gaskets applied, hardware buckets open, correct size impact sockets ready, drift pins at hand, and any necessary slips/drives cut to...
Say this to your foreman
what should i be staging for the journeyman while they are measuring the next piece?