What information does the foreman need when I go do a material count?
Be precise: provide the Duct Size (Width x Height) , Length , Gauge , Connection Type (TDC vs S&D), and the exact part number/tag identifier printed on the shop fabrication label. Do not say "we need a couple more big square pieces."
['Be precise: provide the Duct Size (Width x Height) , Length , Gauge , Connection Type (TDC vs S&D), and the exact part number/tag identifier printed on the shop fabrication label. Do not say "we need a couple more big square pieces."']
Use this as training guidance. The foreman, approved drawings, project specs, manufacturer installation instructions, employer safety policy, and AHJ/code requirements always control the final answer.
Check
Be precise: provide the Duct Size (Width x Height) , Length , Gauge , Connection Type (TDC vs S&D), and the exact part number/tag identifier printed on the shop fabrication label. Do not say "we need a couple more big square pieces."
Steps
Stop and verify the approved detail, manufacturer instructions, foreman direction, and project specs before touching it.
Be precise: provide the Duct Size (Width x Height), Length, Gauge, Connection Type (TDC vs S&D), and the exact part number/tag identifier printed on the shop fabrication label. Do not...
Say this to your foreman
ask boss
what information does the foreman need when i go do a material count?