Apprentice question
Verify first
Verify before you commit. Cheap to catch now.
It means the architect or engineer knows the building layout could vary from the original digital files. Do not order or pre-fabricate that specific piece of ductwork based on the drawing scale. You must physically walk to that spot in the building, pull a physical tape measurement across the actual structural space, and build to fit the real field condition.
['It means the architect or engineer knows the building layout could vary from the original digital files. Do not order or pre-fabricate that specific piece of ductwork based on the drawing scale. You must physically walk to that spot in the building, pull a physical tape measurement across the actual structural space, and build to fit the real field condition.']
what does it mean when the print says "field verify" for a dimension?