What do I do if the architectural ceiling is dropped lower than the plans state?
Stop work on that room segment. Do not install your deep duct runs if they will stick out below the level of the new architectural drywall layout tracks.
['Stop work on that room segment. Do not install your deep duct runs if they will stick out below the level of the new architectural drywall layout tracks.', 'Measure the real clear vertical space remaining from the bottom of the structure to the new low-ceiling track. Inform your foreman immediately so they can coordinate a system redesign with the mechanical engineer to split or flatten the duct profile to fit the new ceiling height restriction.']
Use this as training guidance. The foreman, approved drawings, project specs, manufacturer installation instructions, employer safety policy, and AHJ/code requirements always control the final answer.
Check
Stop work on that room segment. Do not install your deep duct runs if they will stick out below the level of the new architectural drywall layout tracks.
Steps
Stop work on that room segment. Do not install your deep duct runs if they will stick out below the level of the new architectural drywall layout tracks.
Measure the real clear vertical space remaining from the bottom of the structure to the new low-ceiling track. Inform your foreman immediately so they can coordinate a system redesign...
Say this to your foreman
what do i do if the architectural ceiling is dropped lower than the plans state?