Field problem

Verify first

Verify before you commit. Cheap to catch now.

What do I do if I think this duct should be TDC/Ductmate instead of S-and-drive?

Stop and verify the connector callout. Pressure class, duct size, leakage class, and project specs decide the joint system - not what material happens to be nearby.

Verify the required connector type before adapting anything. S-and-drive versus flanged duct is a drawing/spec/shop-standard call, not a habit call.

Rectangular Duct & Fittings 2nd Year YELLOW

Stop if

Watch out

Check

Steps

Say this to your foreman

In Rectangular Duct Assembly: S-and-Drive, I'm looking at: What do I do if I think this duct should be TDC/Ductmate instead of S-and-drive? What should I verify before I cut, drill, seal, cover, move, or install?

More in Rectangular Duct & Fittings