Field problem
Verify first
Verify before you commit. Cheap to catch now.
Line up the two drive hems first. The drive should slide over both hems straight; it is not supposed to pull a badly misaligned duct joint together by itself.
Start the drive only after the joint is lined up. The drive should guide the hems together, not fight a crooked setup.
In Rectangular Duct Assembly: S-and-Drive, I'm looking at: What do I do before starting a drive cleat? What should I verify before I cut, drill, seal, cover, move, or install?