Field problem
Coordinate
Tell someone or document it before you close it up.
Verify piece number/tag, size, system, airflow direction, branch/opening direction, and connection type before locking the joint.
Make the metal fit right before sealing, insulating, or moving on. S-and-drive problems usually come from alignment, seating, support, damage, or wrong connector pattern.
In Rectangular Duct Assembly: S-and-Drive, I'm looking at: What do I do before installing the next rectangular duct piece? What should I verify before I cut, drill, seal, cover, move, or install?