Apprentice question

Verify first

Verify before you commit. Cheap to catch now.

We lost power to the building, but we have 40 pieces of duct to hang. How do we shoot hanger points without laser levels?

Go old-school. Use a traditional clear plastic water level hose line filled with water to transfer accurate, matching horizontal elevation benchmarks across the room structural columns. To establish straight linear paths across the ceiling deck without electronic alignment beams, use a standard chalk box line anchored between two physical tape-measured coordinate points on opposite structural walls, pull it tight, and snap it to mark your anchor drilling paths.

['Go old-school. Use a traditional clear plastic water level hose line filled with water to transfer accurate, matching horizontal elevation benchmarks across the room structural columns. To establish straight linear paths across the ceiling deck without electronic alignment beams, use a standard chalk box line anchored between two physical tape-measured coordinate points on opposite structural walls, pull it tight, and snap it to mark your anchor drilling paths.']

Apprentice Workflow, Communication & Learning 4th Year YELLOW

Stop if

Steps

Say this to your foreman

we lost power to the building, but we have 40 pieces of duct to hang. how do we shoot hanger points without laser levels?