Foreman script

Stop and ask

Stop. Get direction before you touch it.

Verifying sleeve/breakaway connection requirements

Boss, I'm at this damper/rated assembly. This is red-zone: verifying sleeve/breakaway connection requirements. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this damper/rated assembly. This involves verifying sleeve/breakaway connection requirements. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Fire/Smoke Dampers & Rated Assemblies 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

231 verifying sleeve/breakaway connection requirements dampers / rated work red 4 boss, i'm at this damper/rated assembly. this is red-zone: verifying sleeve/breakaway connection requirements. do you want me to hold it until the approved detail is verified? boss, i'm at this damper/rated assembly. this involves verifying sleeve/breakaway connection requirements. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: verifying sleeve/breakaway connection requirements. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Fire/Smoke Dampers & Rated Assemblies