Foreman script
Stop and ask
Stop. Get direction before you touch it.
Boss, I'm at this support location. This is red-zone: understanding difference between hanger and brace. Do you want me to hold it until the approved detail is verified?
Boss, I'm at this support location. This involves understanding difference between hanger and brace. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.
213 understanding difference between hanger and brace seismic / structure red 4 boss, i'm at this support location. this is red-zone: understanding difference between hanger and brace. do you want me to hold it until the approved detail is verified? boss, i'm at this support location. this involves understanding difference between hanger and brace. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: understanding difference between hanger and brace. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?