Foreman script

Stop and ask

Stop. Get direction before you touch it.

Understanding difference between hanger and brace

Boss, I'm at this support location. This is red-zone: understanding difference between hanger and brace. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this support location. This involves understanding difference between hanger and brace. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

213 understanding difference between hanger and brace seismic / structure red 4 boss, i'm at this support location. this is red-zone: understanding difference between hanger and brace. do you want me to hold it until the approved detail is verified? boss, i'm at this support location. this involves understanding difference between hanger and brace. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: understanding difference between hanger and brace. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Seismic Bracing & Structural Coordination