Foreman script

Coordinate

Tell someone or document it before you close it up.

To verify manufacturer-specific connector sequence

Boss, I'm at this rectangular duct joint. I'm seeing to verify manufacturer-specific connector sequence. What detail or method do you want me to follow?

Boss, I'm at this rectangular duct joint. I checked the fit, location, and current detail. I'm seeing to verify manufacturer-specific connector sequence. Do you want me to correct it now, hold it, or compare it to the drawing before I continue?

Rectangular Duct & Fittings 2nd Year BLUE

Stop if

Watch out

Check

Say this to your foreman

121 to verify manufacturer-specific connector sequence rectangular duct assembly: tdc / ductmate blue 2 boss, i'm at this rectangular duct joint. i'm seeing to verify manufacturer-specific connector sequence. what detail or method do you want me to follow? boss, i'm at this rectangular duct joint. i checked the fit, location, and current detail. i'm seeing to verify manufacturer-specific connector sequence. do you want me to correct it now, hold it, or compare it to the drawing before i continue? install issue: to verify manufacturer-specific connector sequence. i have the location/photo and need direction before it turns into rework.

More in Rectangular Duct & Fittings