Apprentice question
Stop and ask
Stop. Get direction before you touch it.
Do not dismantle your entire main rigid duct trunk line infrastructure. Disconnect the short final branch connections or spin-in collars leading to the affected diffusers. If the modification drops within code length rules, extend or loop a code-compliant length of insulated flexible air duct over to the new acoustic ceiling tile lighting positions. If hard pipe is required, fabricate a standard short-radius rectangular transition offset to shift the drop drops over cleanly.
['Do not dismantle your entire main rigid duct trunk line infrastructure. Disconnect the short final branch connections or spin-in collars leading to the affected diffusers. If the modification drops within code length rules, extend or loop a code-compliant length of insulated flexible air duct over to the new acoustic ceiling tile lighting positions. If hard pipe is required, fabricate a standard short-radius rectangular transition offset to shift the drop drops over cleanly.']
the electrical engineer moved the lights, and now every single diffuser has to shift 3 feet. how do i manage the rework efficiently?