Field problem
Verify first
Verify before you commit. Cheap to catch now.
Add or adjust support before relying on the connector. The S-and-drive joint should connect duct sections; it should not carry a sagging run by itself.
Fix the support before the joint carries the load. The connector is not the hanger.
In Rectangular Duct Assembly: S-and-Drive, I'm looking at: The duct weight is pulling the S-and-drive joint open. What should I verify before I cut, drill, seal, cover, move, or install?