Field problem
Verify first
Verify before you commit. Cheap to catch now.
Finish seating the drive full length before tabs, sealing, insulation, or moving on. A half-installed drive leaves the hem unsecured.
Fix the seated side before finishing the drive. If the S-lock is not fully seated, the drive side may never pull the corner tight.
In Rectangular Duct Assembly: S-and-Drive, I'm looking at: The drive is only partly seated. What should I verify before I cut, drill, seal, cover, move, or install?