TAB / Startup Readiness Finish Check
Before TAB comes through, do you want me to verify devices, damper access, labels, and visible connection issues room-by-room?
I'm checking finish work for tab / startup readiness finish check. I have the room/grid, photo, tag, and measurement ready. Before TAB comes through, do you want me to verify devices, damper access, labels, and visible connection issues room-by-room?
Stop if
- Finish work red-zone check: TAB / Startup Readiness Finish Check. I have location, photos, drawings/details, and the access/inspection concern ready. Who verifies before this gets covered or turned over?
Watch out
- Stop if TAB/startup issues involve controls, electrical, fire/smoke dampers, equipment safety, or changing balancing settings without authorization.
Check
- room/grid/area
- photo wide and close
- device tag or drawing note
- measurement/control point
- access/inspection concern