Sway control on long run

Boss, I'm at this brace/structural location. This is red-zone: sway control on long run. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this brace/structural location. This involves sway control on long run. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

205 sway control on long run seismic / structure red 4 boss, i'm at this brace/structural location. this is red-zone: sway control on long run. do you want me to hold it until the approved detail is verified? boss, i'm at this brace/structural location. this involves sway control on long run. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: sway control on long run. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Seismic Bracing & Structural Coordination