Field problem
Verify first
Verify before you commit. Cheap to catch now.
Treat supports as load-path work: support installed after duct joint is already stressed.
Temporarily support the duct before adjusting the connection. Do not let the duct joint become the hanger while you fix supports.
In Hanger Systems, Rods, Straps, Trapeze & Anchors, I'm looking at: Support installed after duct joint is already stressed. What should I verify before I cut, drill, seal, cover, move, or install?