Foreman script

Verify first

Verify before you commit. Cheap to catch now.

Should I add/support hangers before tightening this equipment connection

At [location], I'm checking should i add/support hangers before tightening this equipment connection. I stopped at the unclear point. What do you want me to verify or change before I continue?

At [location], I'm working on Equipment Connections: RTU, AHU, VAV. I checked the visible condition and the approved information I have. The unresolved issue is: Should I add/support hangers before tightening this equipment connection. What decision do you want me to follow before I continue?

Equipment Connections: RTU, AHU, VAV, Fans & Louvers 3rd Year YELLOW

Stop if

Watch out

Check

Say this to your foreman

278 should i add/support hangers before tightening this equipment connection equipment connections: rtu, ahu, vav at [location], i'm checking should i add/support hangers before tightening this equipment connection. i stopped at the unclear point. what do you want me to verify or change before i continue? 3rd year / systems coordination