Field problem

Verify first

Verify before you commit. Cheap to catch now.

Shaft Is Closing Before Riser Inspection and Access Are Complete

Hold close-in until the required duct, supports, joints, dampers, access, penetration details, and inspections are complete and documented.

Airflow, Noise, Vibration & TAB 2nd Year YELLOW

Stop if

Watch out

Check

Steps

Say this to your foreman

The shaft close-in is scheduled, but the riser supports and damper access have not received the required inspection. Can we hold this area and confirm the close-in release?