Foreman script

Stop and ask

Stop. Get direction before you touch it.

Seismic restraint omitted on heavy equipment connection

Boss, I'm at this equipment connection. This is red-zone: seismic restraint omitted on heavy equipment connection. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this equipment connection. This involves seismic restraint omitted on heavy equipment connection. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

211 seismic restraint omitted on heavy equipment connection seismic / structure red 4 boss, i'm at this equipment connection. this is red-zone: seismic restraint omitted on heavy equipment connection. do you want me to hold it until the approved detail is verified? boss, i'm at this equipment connection. this involves seismic restraint omitted on heavy equipment connection. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: seismic restraint omitted on heavy equipment connection. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Seismic Bracing & Structural Coordination