Field problem

Verify first

Verify before you commit. Cheap to catch now.

Seismic restraint cables are left too loose

Seismic cables should restrain movement without pulling the duct out of line. Remove sloppy slack and adjust them per the approved seismic detail.

Seismic Bracing & Structural Coordination 2nd Year YELLOW

Stop if

Watch out

Check

Steps

Say this to your foreman

The seismic cables on [run/location] have visible slack. I checked the brace direction and rods. Do you want them tightened per detail before inspection?

More in Seismic Bracing & Structural Coordination