Field problem
Verify first
Verify before you commit. Cheap to catch now.
Treat supports as load-path work: rod/strap interferes with ceiling grid.
Coordinate before drilling or loading hangers. Grid, sprinkler, cable tray, and trade conflicts get worse once everyone locks in.
In Hanger Systems, Rods, Straps, Trapeze & Anchors, I'm looking at: Rod/strap interferes with ceiling grid. What should I verify before I cut, drill, seal, cover, move, or install?