Field problem
Verify first
Verify before you commit. Cheap to catch now.
Treat supports as load-path work: not checking rod plumb before loading duct.
Set the hanger line before loading the duct. Bad rod height, crooked rods, or an out-of-level trapeze locks the run into a bad line.
In Hanger Systems, Rods, Straps, Trapeze & Anchors, I'm looking at: Rod plumb before loading duct not checked. What should I verify before I cut, drill, seal, cover, move, or install?