Foreman script

Stop and ask

Stop. Get direction before you touch it.

Rod bracing installed with no lateral restraint

Boss, I'm at this support location. This is red-zone: rod bracing installed with no lateral restraint. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this support location. This involves rod bracing installed with no lateral restraint. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

214 rod bracing installed with no lateral restraint seismic / structure red 4 boss, i'm at this support location. this is red-zone: rod bracing installed with no lateral restraint. do you want me to hold it until the approved detail is verified? boss, i'm at this support location. this involves rod bracing installed with no lateral restraint. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: rod bracing installed with no lateral restraint. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Seismic Bracing & Structural Coordination