Foreman script

Stop and ask

Stop. Get direction before you touch it.

Riser Section Binds on a Sleeve or Floor Opening

The riser section is binding at the floor opening and is still supported. I checked the visible sides and the connector is contacting the sleeve. Do you want it lowered for measurement before we change anything?

Hangers, Supports, Rods & Trapeze 2nd Year RED

Stop if

Watch out

Check

Say this to your foreman

riser section binds on a sleeve or floor opening riser duct binds floor opening sleeve connector stuck stop the movement and identify the exact contact point. verify opening size, sleeve position, connector projection, reinforcement, insulation allowance, and section rotation before trying again. the riser section is binding at the floor opening and is still supported. i checked the visible sides and the connector is contacting the sleeve. do you want it lowered for measurement before we change anything?

More in Hangers, Supports, Rods & Trapeze