Foreman script
Verify first
Verify before you commit. Cheap to catch now.
The riser offset shown here puts a joint and reinforcement inside the floor zone. I checked the floor elevations and available shaft depth. Can we verify the approved fitting and penetration arrangement before fabrication?
riser offset lands inside the floor zone riser offset inside floor slab zone joint trapped vertical duct check the offset rise, run, joint locations, support locations, and required access against the actual floor-zone depth before fabrication or installation. the riser offset shown here puts a joint and reinforcement inside the floor zone. i checked the floor elevations and available shaft depth. can we verify the approved fitting and penetration arrangement before fabrication?