Foreman script

Stop and ask

Stop. Get direction before you touch it.

Report a seismic brace you moved

I moved/loosened this brace and I am not sure it went back to the approved angle. Can you verify it before we continue?

I need to report this clean: I moved/loosened this brace at [location] and I am not sure it went back to the approved angle/detail. I stopped work and took photos. Can you verify it before anything gets covered or loaded?

Seismic Bracing & Structural Coordination 2nd Year RED

Watch out

Check

Say this to your foreman

I need to report this clean: I moved/loosened this brace at [location] and I am not sure it went back to the approved angle/detail. I stopped work and took photos. Can you verify it before anything gets covered or loaded?

More in Seismic Bracing & Structural Coordination