Foreman script

Field check

Standard work. Do it right, keep moving.

Replacement Fitting Sketch: Prevent a Second Mirrored or Rotated Remake

I redrew the remake looking downstream, marked top and grid north, and showed the offset moving left. Can you verify the orientation before the shop releases it?

Measuring, Field Verification & Layout Marks 2nd Year GREEN

Watch out

Check

Say this to your foreman

replacement fitting sketch: prevent a second mirrored or rotated remake fitting orientation & field verification replacement duct fitting sketch mirrored remake rotated wrong looking upstream downstream orientation sketch the replacement from a named viewing direction and mark airflow, top, upstream, downstream, connector types, control points, and fitting movement. make it impossible to read the sketch from the opposite side. i redrew the remake looking downstream, marked top and grid north, and showed the offset moving left. can you verify the orientation before the shop releases it?

More in Measuring, Field Verification & Layout Marks