Foreman script

Stop and ask

Stop. Get direction before you touch it.

Recognizing when seismic bracing applies

Boss, I'm at this brace/structural location. This is red-zone: recognizing when seismic bracing applies. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this brace/structural location. This involves recognizing when seismic bracing applies. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

201 recognizing when seismic bracing applies seismic / structure red 4 boss, i'm at this brace/structural location. this is red-zone: recognizing when seismic bracing applies. do you want me to hold it until the approved detail is verified? boss, i'm at this brace/structural location. this involves recognizing when seismic bracing applies. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: recognizing when seismic bracing applies. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Seismic Bracing & Structural Coordination