Foreman script

Stop and ask

Stop. Get direction before you touch it.

Rated penetration cut too large without approved repair

Boss, I'm at this damper/rated assembly. This is red-zone: rated penetration cut too large without approved repair. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this damper/rated assembly. This involves rated penetration cut too large without approved repair. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Fire/Smoke Dampers & Rated Assemblies 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

240 rated penetration cut too large without approved repair dampers / rated work red 4 boss, i'm at this damper/rated assembly. this is red-zone: rated penetration cut too large without approved repair. do you want me to hold it until the approved detail is verified? boss, i'm at this damper/rated assembly. this involves rated penetration cut too large without approved repair. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: rated penetration cut too large without approved repair. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Fire/Smoke Dampers & Rated Assemblies