Foreman script

Stop and ask

Stop. Get direction before you touch it.

PVC-Coated Duct Is Cut Without a Coating-Repair Plan

This PVC-coated section needs a field cut for the revised route. I checked the coating system, but the edge-repair procedure is not in the field package. Can we get the approved method before cutting?

Print Reading, Tags & Layout 3rd Year RED

Stop if

Watch out

Check

Say this to your foreman

pvc-coated duct is cut without a coating-repair plan pvc coated duct field cut coating repair edge treatment hold the field cut until the approved cutting method, edge treatment, compatible fasteners, sealant, and coating-repair procedure are confirmed. this pvc-coated section needs a field cut for the revised route. i checked the coating system, but the edge-repair procedure is not in the field package. can we get the approved method before cutting?

More in Print Reading, Tags & Layout