Foreman script

Verify first

Verify before you commit. Cheap to catch now.

Push back on foreman direction

I want to do this, but the drawing/submittal looks different from the field by [amount]. Can we verify before I final-connect/seal it?

Sealing, Leakage, Mastic & Pressure Testing 4th Year YELLOW

Stop if

Watch out

Check

Say this to your foreman

9092 professional pushback push back on foreman direction i want to do this, but the drawing/submittal looks different from the field by [amount]. can we verify before i final-connect/seal it? foreman wrong direction pushback verify

More in Sealing, Leakage, Mastic & Pressure Testing