Field problem

Stop and ask

Stop. Get direction before you touch it.

Plumbing is already installed through my duct route

Stop before flattening or rerouting duct around the pipe. Document the clash, confirm the latest coordination drawing, and get direction on pipe relocation, duct reroute, split duct, or engineered transition.

Coordination, Clashes, Sequencing & Rework 4th Year RED

Watch out

Check

Steps

Say this to your foreman

Plumbing is already through our duct route at [grid/elevation]. I checked the latest drawings and measured the conflict. Do you want me to hold this section for coordination/RFI, or is there an approved reroute/split/transition direction?