Pharmaceutical Manufacturing Duct Cleanliness
Pharmaceutical ductwork can require documented cleanliness, pressure control, and controlled-material handling.
Stop if
- This is GMP/pharma HVAC. What cleanliness and documentation hold points do we need before install continues?
Watch out
- Do not leave openings exposed or modify after cleaning without approval.
Check
- Confirm cleanliness protocol, bagging/open-end protection, material, seal class, pressure zones, and signoff steps.
Steps
- Identify whether this is normal ductwork or a controlled/special condition.
- Confirm cleanliness protocol, bagging/open-end protection, material, seal class, pressure zones, and signoff steps.
- Get the current drawing/detail/spec/submittal before changing routing, material, access, or support.
- Bring photos, location, and what you checked to the foreman before closing or covering the work.
Say this to your foreman
This is GMP/pharma HVAC. What cleanliness and documentation hold points do we need before install continues?