Common mistake
Verify first
Verify before you commit. Cheap to catch now.
The duct construction class must match the system pressure classification on the mechanical drawing. Include the pressure class, gauge, seam type, and reinforcement schedule in every shop order. Verbal orders for duct construction are insufficient.