Not snapping/chalking straight hanger lines
Snap or mark a straight hanger line from verified control points before drilling or loading duct.
Stop if
- Can you verify this hanger line before I drill/load the run?
Watch out
- Do not eyeball a hanger line across a long run.
Check
- Confirm grid/control line.
- Mark start and end points.
- Snap/chalk/laser the line.
- Check conflicts before drilling.
- Verify line with foreman if route is tight.
Steps
- Confirm grid/control line.
- Mark start and end points.
- Snap/chalk/laser the line.
- Check conflicts before drilling.
- Verify line with foreman if route is tight.
Say this to your foreman
Can you verify this hanger line before I drill/load the run?
More in Print Reading, Tags & Layout