Not asking before drilling into deck/concrete
Do not drill deck or concrete until the location, depth, embed, scan/approval, and approved detail are verified.
Stop if
- Is this location approved to drill, and do we need scan/anchor/detail verification first?
Watch out
- Do not drill structural deck, slab, beam, or concrete just because the hanger line needs a hole.
Check
- Find the approved anchor/detail.
- Confirm location and edge distance with layout/control lines.
- Check for post-tension, rebar, deck flute, embedded conduit, or no-drill zones.
- Use the approved bit/anchor/depth.
- Ask before drilling if anything is unclear.
Steps
- Find the approved anchor/detail.
- Confirm location and edge distance with layout/control lines.
- Check for post-tension, rebar, deck flute, embedded conduit, or no-drill zones.
- Use the approved bit/anchor/depth.
- Ask before drilling if anything is unclear.
Say this to your foreman
Is this location approved to drill, and do we need scan/anchor/detail verification first?