Foreman script

Stop and ask

Stop. Get direction before you touch it.

Night Tie-In Cannot Be Completed Inside the Shutdown Window

The night tie-in is taking longer than planned. I checked the remaining joints, controls, temporary caps, and restoration steps, and we will not finish inside the approved shutdown window. Do you want us to restore to the rollback point, extend the shutdown through the proper channel, or hold the area out of service?

Grease Duct, Kitchen & Industrial Exhaust 3rd Year RED

Stop if

Watch out

Check

Say this to your foreman

night tie-in cannot be completed inside the shutdown window night tie in shutdown window grocery retail restore rollback occupied remodel stop before the shutdown window expires with the system left in an unknown condition. account for what is disconnected, what can be safely restored, what must remain isolated, and who owns the decision to extend, postpone, or place the system back in service. the night tie-in is taking longer than planned. i checked the remaining joints, controls, temporary caps, and restoration steps, and we will not finish inside the approved shutdown window. do you want us to restore to the rollback point, extend the shutdown through the proper channel, or hold the area out of service?

More in Grease Duct, Kitchen & Industrial Exhaust