Foreman script

Stop and ask

Stop. Get direction before you touch it.

Mixing ceiling radiation damper with wall fire damper requirements

Boss, I'm at this damper/rated assembly. This is red-zone: mixing ceiling radiation damper with wall fire damper requirements. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this damper/rated assembly. This involves mixing ceiling radiation damper with wall fire damper requirements. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Fire/Smoke Dampers & Rated Assemblies 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

244 mixing ceiling radiation damper with wall fire damper requirements dampers / rated work red 4 boss, i'm at this damper/rated assembly. this is red-zone: mixing ceiling radiation damper with wall fire damper requirements. do you want me to hold it until the approved detail is verified? boss, i'm at this damper/rated assembly. this involves mixing ceiling radiation damper with wall fire damper requirements. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: mixing ceiling radiation damper with wall fire damper requirements. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Fire/Smoke Dampers & Rated Assemblies