Ask when connector type, gasket, cleat/bolt schedule, pressure class, or manufacturer detail is unclear.
Watch out
Do not guess the order on a manufacturer-specific connector.
Check
Check submittal/shop standard
Verify sequence before final assembly
Steps
Align the duct sections square.
Check flange faces, corners, gasket, and cleats/bolts.
Fix damage or missing parts before tightening.
Tighten or cleat evenly per project/manufacturer detail.
Focus on the actual issue: forgetting to verify manufacturer-specific connector sequence.
Say this to your foreman
In Rectangular Duct Assembly: TDC / Ductmate / Flanges, I'm looking at: Missing to verify manufacturer-specific connector sequence. What should I verify before I cut, drill, seal, cover, move, or install?