Field problem
Verify first
Verify before you commit. Cheap to catch now.
Install the approved flange cleat or side fastening before calling the joint complete. The straight flange faces need even contact and gasket compression, not just tight corner bolts.
In Rectangular Duct Assembly: TDC / Ductmate / Flanges, I'm looking at: Missing cleat on long side of flange. What should I verify before I cut, drill, seal, cover, move, or install?