Stop. Get direction before you touch it.

Missing brace at duct riser/vertical run

Do not move seismic/sway bracing casually: missing brace at duct riser/vertical run.

High-risk starter answer - stop before you change, move, drill, or attach anything tied to seismic bracing, sway control, structural support, crane work, or rigging. Verify the approved detail and the qualified person's direction before acting. If a run or equipment connection appears to be missing restraint, flag it instead of adding a random brace.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Steps

Say this to your foreman

In Seismic Bracing, Sway Control & Structural Coordination, I'm looking at: Missing brace at duct riser/vertical run. What should I verify before I cut, drill, seal, cover, move, or install?