Foreman script
Verify first
Verify before you commit. Cheap to catch now.
Is this bottom-of-duct from AFF, or are we using another reference?
I'm checking measure elevation from aff or control line. I measured the field condition and want to verify the reference point before I act. Is this bottom-of-duct from AFF, or are we using another reference?
9018 measure elevation from aff or control line coordination measuring yellow 3 is this bottom-of-duct from aff, or are we using another reference? i'm checking measure elevation from aff or control line. i measured the field condition and want to verify the reference point before i act. is this bottom-of-duct from aff, or are we using another reference? measurement question: measure elevation from aff or control line. i have the location, photo, and measured reference point ready. who should verify before this becomes cut, ordered, drilled, or covered?