Foreman script
Stop and ask
Stop. Get direction before you touch it.
We have the riser section staged at the shaft opening. I checked the opening, receiving elevation, and connector orientation. What is the approved handling and rotation-control plan before this section enters the shaft?
lowering duct into a shaft without controlling rotation shaft riser duct rotating lowering through floor opening control rotation before the section enters the opening, confirm the approved handling plan, support points, communication, and how rotation will be controlled. a long section can turn, bind, or strike the shaft wall even when its weight is supported. we have the riser section staged at the shaft opening. i checked the opening, receiving elevation, and connector orientation. what is the approved handling and rotation-control plan before this section enters the shaft?