Foreman script

Stop and ask

Stop. Get direction before you touch it.

Lowering Duct Into a Shaft Without Controlling Rotation

We have the riser section staged at the shaft opening. I checked the opening, receiving elevation, and connector orientation. What is the approved handling and rotation-control plan before this section enters the shaft?

Equipment Connections: RTU, AHU, VAV, Fans & Louvers 2nd Year RED

Stop if

Watch out

Check

Say this to your foreman

lowering duct into a shaft without controlling rotation shaft riser duct rotating lowering through floor opening control rotation before the section enters the opening, confirm the approved handling plan, support points, communication, and how rotation will be controlled. a long section can turn, bind, or strike the shaft wall even when its weight is supported. we have the riser section staged at the shaft opening. i checked the opening, receiving elevation, and connector orientation. what is the approved handling and rotation-control plan before this section enters the shaft?

More in Equipment Connections: RTU, AHU, VAV, Fans & Louvers