Foreman script

Stop and ask

Stop. Get direction before you touch it.

Leaving movement clearance at expansion/flexible connector

Boss, I'm at this flex run. This is red-zone: leaving movement clearance at expansion/flexible connector. Do you want me to hold it until the approved detail is verified?

Boss, I'm at this flex run. This involves leaving movement clearance at expansion/flexible connector. I'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it.

Seismic Bracing & Structural Coordination 4th Year RED

Stop if

Watch out

Check

Say this to your foreman

216 leaving movement clearance at expansion/flexible connector seismic / structure red 4 boss, i'm at this flex run. this is red-zone: leaving movement clearance at expansion/flexible connector. do you want me to hold it until the approved detail is verified? boss, i'm at this flex run. this involves leaving movement clearance at expansion/flexible connector. i'm not moving, cutting, covering, anchoring, or modifying anything until you verify the approved detail or tell me who needs to look at it. red-zone item: leaving movement clearance at expansion/flexible connector. i have the location, photo, and drawing/detail ready. who needs to verify before work continues?

More in Seismic Bracing & Structural Coordination