Bring the flange together evenly: leaving bolt heads/screws interfering with insulation. Start hardware in a balanced way and do not twist the flange or crush the gasket.
Check hardware orientation before insulation. Bolt heads or screws sticking the wrong way can create ugly cover-up and vapor-barrier problems.
In Rectangular Duct Assembly: TDC / Ductmate / Flanges, I'm looking at: Leaving bolt heads/screws interfering with insulation. What should I verify before I cut, drill, seal, cover, move, or install?